Piping Dept Projects

  • Vapor recovery unit package (MVCP000076)    

Piping Stress Analysis  for 63 lines

–Preparation of Load Cases,

–Stress Analysis and Code Compliance as per ASME B 31.3 for Stress category lines as per Critical line list

–Piping Isometrics with all PMS details

–Stress analysis report in PDF

 

  • Stress Analysis for Process Lines

Piping Stress Analysis  for 39 lines

–Preparation of Load Cases,

–Stress Analysis and Code Compliance as per ASME B 31.3 for Stress category lines as per Critical line list.

–Stress Isometric Markup on Hard Copy.

–Piping Isometrics with all PMS details

–Stress analysis report in PDF

–Native file of Caesar-II

 

  • Flare Gas Recovery system

Piping Stress Analysis 12 lines

–Preparation of Load Cases,

–Stress Analysis and Code Compliance as per ASME B 31.3 for Stress category lines as per Critical line list.

–Stress Isometric Markup on Hard Copy.

–Cadworx model with all PMS details

–Stress analysis report in PDF

–Native file of Caesar-II

 

  • Pipe stress analysis for MC2 line of MOC

–Site visit

–Review existing data of condensate drum (D-245) and de- aerator (D-2020), Piping routing of MC2 line

–Hand sketch Isometrics with all PMS details

–P&ID with critical line list

–Slug Flow calculation report

–Dynamic Stress Analysis report in PDF